Landspítali University Hospital complex
Installation of steel structures across the construction site. Over 1,000 tonnes of steel installed; the main hospital alone approx. 700 tonnes.
Columns, beams, trusses, bracing and secondary steel. Bolted connections tightened and recorded.
Columns, beams, hollow-core slabs and wall elements, set to your production and delivery plan.
Warehouses, production halls and tech-park buildings, for contractors and developers.
Site supervision, lift plans, bolt tightening records and tolerance surveys in line with EN 1090-2.
Installation of steel structures across the construction site. Over 1,000 tonnes of steel installed; the main hospital alone approx. 700 tonnes.
Steel structure installation for a new 2,200 m² rental centre. 50 tonnes of steel, installed on schedule.
Installation for an extension to an existing building, through four floors, including a lift shaft from the basement of the existing building.
Sales showroom building.
Installation of the building's metal structures.
Installation of metal structures and sandwich panels.
Installation of steel structures and sandwich panels, 4,000 m².
Long-term erection partner.








Send drawings, scope and target dates. We reply with availability and a proposal.